Redlog solutions

SoftyStock: Inventory and Lot Size Optimization

Multi-level optimization of safety stocks and lot sizes through statistical modelling and simulation techniques

Solution

  • Monitoring by service level

  • Management of exceptional events

  • Estimation turnover left

  • Integration of the results into the standard MRP process of your ERP

Earnings

  • Sizing of the safety stock for the finished products, semi-finished and components

  • Optimization of the location of safety stocks

  • Calculation of distribution lot sizes

  • Material End-of-life management

SplitCast : Optimized forecast staggered period split

Optimization of the period split of forecast requirements through Machine Learning methods

Solution

  • Segmentation of the product portfolio by data mining methods

  • Graphical analysis of splitting scenarios

  • Possibility to manually adjust scenarios

  • Integration of the results into the standard MRP process of your ERP

Earnings

  • Reduction of gaps between requirements and good issues

  • Reduction of safety stocks

  • Anticipation of shortages

SimTank : Planning and scheduling of tanks and vats resources

Planning and scheduling of industrial processes including the use of tanks / vats (resources with a non-predictable use) using an approach combining simulation and optimization techniques

Solution

  • Simulation of the impact of production scenarios

  • Anticipating the risks of missing capacity

  • Identification of adjustments to be made

  • Synchronization with ERP

Earnings

  • Optimization of production sequences

  • Reduction in the saturation rate of the tank/vat park

  • Support for long-term investment decisions

SimLab : Quality inspection workload planning

Projection of the quality inspection workload based on planned production/receipt and inspection dynamisation rules

Solution

  • Simulation of the impact of inspection dynamisation scenarios

  • Estimation of missing capacity by period

  • Estimation of planned inspection costs

  • Synchronization with ERP

Earnings

  • Anticipation of the workload of inspection laboratories

  • Simulation on control optimization leverages

  • Optimization of workload smoothing

SimCap : Production planning and scheduling

Planning and scheduling of complex industrial processes including the use of traditional resources such as Machine / Labour through an approach combining simulation and optimization techniques

Solution

  • Simulation of alternative workload / available capacity smoothing scenarios

  • Anticipation of the workload on the different levels of the industrial process

  • Solution integrated with SimTank and SimLab

  • Synchronization with ERP

Earnings

  • Optimization of production sequences

  • Optimization of resource allocation
  • Smoothing of the workload in the mid-term

You want to know more about our solutions